Our laboratories are slated to move into a state-of-the-art new space within the Science and Engineering Hall (SEH). The construction team broke ground in October of 2011 and the moving of our laboratories is planned for January of 2015. The photo diary below follows the above-ground construction of the building.
October 20, 2011 - Groundbreaking for the Science and Engineering Hall Architectural design showing the SEH in its environment
BG 1 BG 2
November 5, 2013 - Construction of our space on the sixth floor SE corner. December 13, 2013 - Raising the seventh floor.
Cleanup Casework 2
December 18, 2013 - Topping out with the eighth floor above ground. December 26, 2013 - More glass side panels are attached.
Casework 1 Casework 2
January 15, 2014 - Most cranes are removed... January 23, 2014 - ...and replaced by outside elevators.
Moving 1 Moving 2
February 11, 2014 - Outside walls of our lab are in place. February 20, 2014 - The SE corner is beginning to look like a building.
PP 1 PP 2
February 28, 2014 - Floors seven... March 13, 2014 - ...and eight are getting walls.
AD 1 AD 2
March 24, 2014 - Looks like a building. March 31, 2014 - Last crane is gone.
FS 1 FS 2
April 8, 2014 - The SE corner from another angle. April 22, 2014 - One of the side panels of our lab is left unfinished.
FS 1 FS 2
May 19, 2014 - Is that wooden panel left to move in large equipment? June 3, 2014 - The NE corner of the building is geting ceramic tiles.
FS 1 FS 2
June 25, 2014 - Ready for ceramic tiles on the SE corner. August 5, 2014 - Outside elevator is erected on the SE corner.
FS 1 FS 2
September 17, 2014 - Touring the building for the first time. September 17, 2014 - Approaching our new lab on the sixth floor.
FS 1 FS 2
September 17, 2014 - Entrance to the lab with romantic stairs. September 17, 2014 - A few cables are still missing.
FS 1 FS 2
September 17, 2014 - Lab with a view. September 17, 2014 - ...and more view.
FS 1 FS 2
September 17, 2014 - Access to the cell culture room. September 17, 2014 - These instruments will be displaced by other ones in a few months.
FS 1 FS 2
September 17, 2014 - We will be wired... September 17, 2014 - Staging of the casework.